Onshore wind project GEN-2015-076, Cedar County

Onshore wind project GEN-2015-076, Cedar County is a 158 MW onshore wind request withdrawn in the SPP interconnection queue, in Cedar County, Nebraska, connecting to NPPD.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingDec 2020 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2015-076
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
NPPD
Connection point (POI)
Belden 115kv Substation
Location
Cedar County, Nebraska
Technology
Wind: 158 MW
Total requested
158 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 September 2015
Proposed online date
December 2020
Came online
December 2020

Location

Marker shows the centre of Cedar County; the queue data does not give exact sites.

Power plants in Nebraska Β· Transmission lines in Nebraska

Other requests in Cedar County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem