United States βΊ Grid βΊ Interconnection queues βΊ Oregon
GAS Β· WESTNational Energy and Gas Tx
National Energy and Gas Tx is a 620 MW gas request withdrawn in the West interconnection queue, in Morrow County, Oregon, connecting to National Energy & Gas Transmission, Inc..
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G69
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- National Energy & Gas Transmission, Inc.
- Developer
- National Energy & Gas Transmission, Inc.
- Connection point (POI)
- Coyote Springs loop on the McNary/Slatt 500 kV line
- Location
- Morrow County, Oregon
- Technology
- Gas: 620 MW
- Total requested
- 620 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 12 July 2001
- Proposed online date
- February 2005
Location
Marker shows the centre of Morrow County; the queue data does not give exact sites.
Other requests in Morrow County
- Solar project G0678, Morrow CountySolar Β· 1,200 MW Β· in study
- Gas project G0752, Morrow CountyGas Β· 670 MW Β· in study
- Battery storage project G0963, Morrow CountyBattery storage Β· 650 MW Β· in study
- Solar + storage project T2-008, Morrow CountySolar + storage Β· 500 MW Β· in study
- Solar + storage project G0478, Morrow CountySolar + storage Β· 500 MW Β· in study
- Solar + storage project T2-031, Morrow CountySolar + storage Β· 400 MW Β· in study
- Solar + storage project T2-087, Morrow CountySolar + storage Β· 400 MW Β· in study
- Solar + storage project T2-030, Morrow CountySolar + storage Β· 400 MW Β· in study
- Solar + storage project T2-086, Morrow CountySolar + storage Β· 400 MW Β· in study
- Onshore wind project G0366, Morrow CountyOnshore wind Β· 302 MW Β· in study
- Solar project G0944, Morrow CountySolar Β· 261 MW Β· in study
- Onshore wind project G0435, Morrow CountyOnshore wind Β· 238 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem