United States βΊ Grid βΊ Interconnection queues βΊ Indiana
SOLAR + STORAGE Β· PJMSolar + storage project AH2-282, Noble County
Solar + storage project AH2-282, Noble County is a 75.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Noble County, Indiana, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH2-282
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Burnworth 138 kV
- Location
- Noble County, Indiana
- Technology
- Solar: 75.0 MW Β· Battery
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 10 March 2022
- Proposed online date
- December 2026
- Withdrawn
- November 2023
Location
Marker shows the centre of Noble County; the queue data does not give exact sites.
Other requests in Noble County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem