United States βΊ Grid βΊ Interconnection queues βΊ Oregon
ONSHORE WIND Β· WESTThe Dalles Wind Farm
The Dalles Wind Farm is a 350 MW onshore wind request withdrawn in the West interconnection queue, in Wasco County, Oregon, connecting to NextEra Energy Resources, LLC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2002 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G98
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NextEra Energy Resources, LLC
- Developer
- NextEra Energy Resources, LLC
- Connection point (POI)
- Big Eddy-Redmond 230 kV line
- Location
- Wasco County, Oregon
- Technology
- Wind: 350 MW
- Total requested
- 350 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 19 March 2002
- Proposed online date
- September 2003
Location
Marker shows the centre of Wasco County; the queue data does not give exact sites.
Other requests in Wasco County
- Solar + storage project G0681, Wasco CountySolar + storage Β· 2,000 MW Β· in study
- Battery storage project G1055, Wasco CountyBattery storage Β· 1,300 MW Β· in study
- Solar + storage project G0773, Wasco CountySolar + storage Β· 1,300 MW Β· in study
- Solar + storage project G0797, Wasco CountySolar + storage Β· 1,300 MW Β· in study
- Other project G0787, Wasco CountyOther Β· 1,200 MW Β· in study
- Battery storage project G0774, Wasco CountyBattery storage Β· 650 MW Β· in study
- Onshore wind project G0619, Wasco CountyOnshore wind Β· 500 MW Β· in study
- Onshore wind project G0974, Wasco CountyOnshore wind Β· 250 MW Β· in study
- Solar project G0367, Wasco CountySolar Β· 202 MW Β· in study
- Onshore wind project G0345, Wasco CountyOnshore wind Β· 201 MW Β· in study
- Solar project G0368, Wasco CountySolar Β· 101 MW Β· in study
- Solar project G0524, Wasco CountySolar Β· 20.0 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem