ONSHORE WIND Β· WEST

Onshore wind project GI-0911, Morton County

Onshore wind project GI-0911, Morton County is a 400 MW onshore wind request withdrawn in the West interconnection queue, in Morton County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-0911
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
AVS-Broadland 345kV
Location
Morton County, North Dakota
Technology
Wind: 400 MW
Total requested
400 MW
Service type
NRIS and ERIS
Study phase
IAP
Queue status
Withdrawn
Entered queue
16 April 2009
Proposed online date
March 2012

Location

Marker shows the centre of Morton County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Morton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem