Elm Line Energy Storage

Elm Line Energy Storage is a 10.0 MW battery storage request withdrawn in the PJM interconnection queue, in Bradford County, Pennsylvania, connecting to PENELEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2020 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AF2-405
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
East Sayre 34.5 kV III
Location
Bradford County, Pennsylvania
Technology
Battery: 10.0 MW
Total requested
10.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
Queue status
Withdrawn
Entered queue
31 March 2020
Proposed online date
June 2021
Withdrawn
December 2024

Location

Marker shows the centre of Bradford County; the queue data does not give exact sites.