ONSHORE WIND Β· MISO

Onshore wind project G768, Watonwan County

Onshore wind project G768, Watonwan County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Watonwan County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2007 (completed)
  2. Withdrawn / abandonedJun 2012 (project stopped here)
  3. ConsentedJun 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G768
Grid region
MISO (Midcontinent)
Connection point (POI)
Watonwan 69 kV
Location
Watonwan County, Minnesota
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Study phase
DPP - SIS
Queue status
Withdrawn
Entered queue
21 March 2007
Agreement signed
26 June 2012
Proposed online date
June 2009
Withdrawn
June 2012

Location

Marker shows the centre of Watonwan County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Watonwan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem