United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project G768, Watonwan County
Onshore wind project G768, Watonwan County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Watonwan County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2007 (completed)
- Withdrawn / abandonedJun 2012 (project stopped here)
- ConsentedJun 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G768
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Watonwan 69 kV
- Location
- Watonwan County, Minnesota
- Technology
- Wind: 50.0 MW
- Total requested
- 50.0 MW
- Study phase
- DPP - SIS
- Queue status
- Withdrawn
- Entered queue
- 21 March 2007
- Agreement signed
- 26 June 2012
- Proposed online date
- June 2009
- Withdrawn
- June 2012
Location
Marker shows the centre of Watonwan County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Watonwan County
- Solar project J4161, Watonwan CountySolar Β· 1,000 MW Β· in study
- Solar project J3823, Watonwan CountySolar Β· 300 MW Β· withdrawn
- Solar project J3524, Watonwan CountySolar Β· 300 MW Β· withdrawn
- Onshore wind project H019, Watonwan CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project H044, Watonwan CountyOnshore wind Β· 75.0 MW Β· withdrawn
- Onshore wind project G411, Watonwan CountyOnshore wind Β· 19.8 MW Β· withdrawn
- Onshore wind project J032, Watonwan CountyOnshore wind Β· 4.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem