πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project H044, Watonwan County

Onshore wind project H044, Watonwan County is a 75.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Watonwan County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2008 (completed)
  2. Withdrawn / abandonedJan 2011 (project stopped here)
  3. ConsentedJan 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
H044
Grid region
MISO (Midcontinent)
Connection point (POI)
ITC Midwest Madelia 69 kV Subsation
Location
Watonwan County, Minnesota
Technology
Wind: 75.0 MW
Total requested
75.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
12 June 2008
Agreement signed
5 January 2011
Proposed online date
December 2011
Withdrawn
January 2011

Location

Marker shows the centre of Watonwan County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Watonwan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem