United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
SOLAR Β· MISOSolar project J3823, Watonwan County
Solar project J3823, Watonwan County is a 300 MW solar request withdrawn in the MISO interconnection queue, in Watonwan County, Minnesota, connecting to NORTHERN STATES POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3823
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN STATES POWER COMPANY
- Connection point (POI)
- Crandall - Fieldon 345.0kV
- Location
- Watonwan County, Minnesota
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 12 April 2024
- Proposed online date
- September 2028
- Withdrawn
- September 2025
Location
Marker shows the centre of Watonwan County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Watonwan County
- Solar project J4161, Watonwan CountySolar Β· 1,000 MW Β· in study
- Solar project J3524, Watonwan CountySolar Β· 300 MW Β· withdrawn
- Onshore wind project H019, Watonwan CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project H044, Watonwan CountyOnshore wind Β· 75.0 MW Β· withdrawn
- Onshore wind project G768, Watonwan CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Onshore wind project G411, Watonwan CountyOnshore wind Β· 19.8 MW Β· withdrawn
- Onshore wind project J032, Watonwan CountyOnshore wind Β· 4.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem