ONSHORE WIND Β· PJM

Onshore wind project W3-133, Stark County

Onshore wind project W3-133, Stark County is a 19.5 MW onshore wind request withdrawn in the PJM interconnection queue, in Stark County, Illinois, connecting to ComEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2010 (completed)
  2. Withdrawn / abandonedSep 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
W3-133
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Kewanee
Location
Stark County, Illinois
Technology
Wind: 19.5 MW
Total requested
19.5 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
29 October 2010
Proposed online date
December 2011
Withdrawn
September 2011

Location

Marker shows the centre of Stark County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Stark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem