United States βΊ Grid βΊ Interconnection queues βΊ Wyoming
SOLAR Β· WESTSolar project 875, Fremont County
Solar project 875, Fremont County is a 20.0 MW solar request withdrawn in the West interconnection queue, in Fremont County, Wyoming, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 875
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Circuit WCM342 out of WAPA Copper Mountain substation
- Location
- Fremont County, Wyoming
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN BY CUSTOMER
- Queue status
- Withdrawn
- Entered queue
- 11 May 2017
- Proposed online date
- December 2018
Location
Marker shows the centre of Fremont County; the queue data does not give exact sites.
Other requests in Fremont County
- Solar + storage project 789, Fremont CountySolar + storage Β· 74.9 MW Β· agreement signed
- Gas project 646, Fremont CountyGas Β· 0.0 MW Β· built
- Onshore wind project 239, Fremont CountyOnshore wind Β· 250 MW Β· withdrawn
- Solar + storage project 951, Fremont CountySolar + storage Β· 80.0 MW Β· withdrawn
- Solar + storage project TCS-06, Fremont CountySolar + storage Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem