United States β€Ί Grid β€Ί Interconnection queues β€Ί Wyoming

SOLAR Β· WEST

Solar project 875, Fremont County

Solar project 875, Fremont County is a 20.0 MW solar request withdrawn in the West interconnection queue, in Fremont County, Wyoming, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
875
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Circuit WCM342 out of WAPA Copper Mountain substation
Location
Fremont County, Wyoming
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN BY CUSTOMER
Queue status
Withdrawn
Entered queue
11 May 2017
Proposed online date
December 2018

Location

Marker shows the centre of Fremont County; the queue data does not give exact sites.

Power plants in Wyoming Β· Transmission lines in Wyoming

Other requests in Fremont County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem