United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project TCS-02, Adams County

Onshore wind project TCS-02, Adams County is a 123 MW onshore wind request withdrawn in the West interconnection queue, in Adams County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2018 (completed)
  2. Withdrawn / abandonedSep 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
TCS-02
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Future Neilson Swithching Station
Location
Adams County, Washington
Technology
Wind: 123 MW
Total requested
123 MW
Service type
NRIS and ERIS
Study phase
Request Status: Withdrawn; Facilities Study: N/A; Phase One Cluster Study: Feasibility; Phase One Re-Study: N/A; Phase T
Queue status
Withdrawn
Entered queue
8 June 2018
Proposed online date
November 2021
Withdrawn
September 2022

Location

Marker shows the centre of Adams County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Adams County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem