United States βΊ Grid βΊ Interconnection queues βΊ Alabama
SOLAR Β· SOUTHEASTSolar project IC-534, Sumter County
Solar project IC-534, Sumter County is a 80.0 MW solar request withdrawn in the Southeast interconnection queue, in Sumter County, Alabama, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandonedJul 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-534
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Bellamy - Epes 115kV Line
- Location
- Sumter County, Alabama
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 15 November 2016
- Withdrawn
- July 2017
Location
Marker shows the centre of Sumter County; the queue data does not give exact sites.
Other requests in Sumter County
- Solar project 25-IC-1360, Sumter CountySolar Β· 75.0 MW Β· in study
- Solar project 25-IC-1378, Sumter CountySolar Β· 199 MW Β· withdrawn
- Solar project 25-IC-1381, Sumter CountySolar Β· 156 MW Β· withdrawn
- Solar project IC-780, Sumter CountySolar Β· 80.0 MW Β· withdrawn
- Solar project IC-781, Sumter CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem