United States βΊ Grid βΊ Interconnection queues βΊ Alabama
SOLAR Β· SOUTHEASTSolar project 25-IC-1378, Sumter County
Solar project 25-IC-1378, Sumter County is a 199 MW solar request withdrawn in the Southeast interconnection queue, in Sumter County, Alabama, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2025 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25-IC-1378
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Sykes Switching Station - Greene County 230 kV Line
- Location
- Sumter County, Alabama
- Technology
- Solar: 199 MW
- Total requested
- 199 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 17 April 2025
- Withdrawn
- June 2025
Location
Marker shows the centre of Sumter County; the queue data does not give exact sites.
Other requests in Sumter County
- Solar project 25-IC-1360, Sumter CountySolar Β· 75.0 MW Β· in study
- Solar project 25-IC-1381, Sumter CountySolar Β· 156 MW Β· withdrawn
- Solar project IC-780, Sumter CountySolar Β· 80.0 MW Β· withdrawn
- Solar project IC-534, Sumter CountySolar Β· 80.0 MW Β· withdrawn
- Solar project IC-781, Sumter CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem