🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Rhode Island

BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 27.4 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Providence County, Rhode Island.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2022 (completed)
  2. Withdrawn / abandonedOct 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1232
Grid region
ISO-NE (New England)
Connection point (POI)
NEC 115/34.5kV Iron Mine Hill Substation #1203 spare buss position #2
Location
Providence County, Rhode Island
Technology
Battery: 27.4 MW
Total requested
27.4 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
4 March 2022
Proposed online date
December 2025
Withdrawn
October 2024

Location

Marker shows the centre of Providence County; the queue data does not give exact sites.

Power plants in Rhode Island · Transmission lines in Rhode Island

Other requests in Providence County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem