United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

GAS Β· MISO

Gas project J422, St. Clair County

Gas project J422, St. Clair County is a 30.0 MW gas request withdrawn in the MISO interconnection queue, in St. Clair County, Michigan.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2014 (completed)
  2. Withdrawn / abandonedDec 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J422
Grid region
MISO (Midcontinent)
Connection point (POI)
Greenwood Energy Center
Location
St. Clair County, Michigan
Technology
Gas: 30.0 MW
Total requested
30.0 MW
Study phase
Int FaS
Queue status
Withdrawn
Entered queue
17 November 2014
Proposed online date
September 2015
Withdrawn
December 2015

Location

Marker shows the centre of St. Clair County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in St. Clair County