United States › Grid › Interconnection queues › West Virginia
ONSHORE WIND · PJMPinnacle WF
Pinnacle WF is a 85.0 MW onshore wind request built and operating in the PJM interconnection queue, in Mineral County, West Virginia, connecting to APS.
Request details
- Queue ID
- N47
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Beryl 138kV
- Location
- Mineral County, West Virginia
- Technology
- Wind: 85.0 MW
- Total requested
- 85.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 31 January 2005
- Agreement signed
- 3 February 2010
- Proposed online date
- December 2011
- Came online
- November 2011
Location
Marker shows the centre of Mineral County; the queue data does not give exact sites.
Power plants in West Virginia · Transmission lines in West Virginia
Other requests in Mineral County
- Solar project AG2-448, Mineral CountySolar · 50.0 MW · in study
- Black Rock WindOnshore wind · 110 MW · built
- New Creek Mountain Wind FarmOnshore wind · 103 MW · built
- Onshore wind project R22, Mineral CountyOnshore wind · 90.0 MW · withdrawn
- Onshore wind project U3-025, Mineral CountyOnshore wind · 80.0 MW · withdrawn
- Onshore wind project T158, Mineral CountyOnshore wind · 70.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem