United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
ONSHORE WIND Β· PJMOnshore wind project R22, Mineral County
Onshore wind project R22, Mineral County is a 90.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Mineral County, West Virginia, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2006 (completed)
- Withdrawn / abandonedJan 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R22
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Elk Garden - Junction 138kV
- Location
- Mineral County, West Virginia
- Technology
- Wind: 90.0 MW
- Total requested
- 90.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 12 October 2006
- Proposed online date
- November 2009
- Withdrawn
- January 2009
Location
Marker shows the centre of Mineral County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Mineral County
- Solar project AG2-448, Mineral CountySolar Β· 50.0 MW Β· in study
- Black Rock WindOnshore wind Β· 110 MW Β· built
- New Creek Mountain Wind FarmOnshore wind Β· 103 MW Β· built
- Pinnacle WFOnshore wind Β· 85.0 MW Β· built
- Onshore wind project U3-025, Mineral CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Onshore wind project T158, Mineral CountyOnshore wind Β· 70.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem