United States β€Ί Grid β€Ί Interconnection queues β€Ί West Virginia

ONSHORE WIND Β· PJM

Onshore wind project R22, Mineral County

Onshore wind project R22, Mineral County is a 90.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Mineral County, West Virginia, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2006 (completed)
  2. Withdrawn / abandonedJan 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R22
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Elk Garden - Junction 138kV
Location
Mineral County, West Virginia
Technology
Wind: 90.0 MW
Total requested
90.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
12 October 2006
Proposed online date
November 2009
Withdrawn
January 2009

Location

Marker shows the centre of Mineral County; the queue data does not give exact sites.

Power plants in West Virginia Β· Transmission lines in West Virginia

Other requests in Mineral County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem