United States βΊ Grid βΊ Interconnection queues βΊ Illinois
SOLAR Β· MISOSolar project J2713, Mercer County
Solar project J2713, Mercer County is a 47.6 MW solar request withdrawn in the MISO interconnection queue, in Mercer County, Illinois, connecting to MIDAMERICAN ENERGY CO..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2713
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MIDAMERICAN ENERGY CO.
- Connection point (POI)
- OAK GROVE - MERCER CO (AMRN)
- Location
- Mercer County, Illinois
- Technology
- Solar: 47.6 MW
- Total requested
- 47.6 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- April 2027
- Withdrawn
- October 2025
Location
Marker shows the centre of Mercer County; the queue data does not give exact sites.
Other requests in Mercer County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem