ONSHORE WIND Β· MISOOnshore wind project G569, Mercer County
Onshore wind project G569, Mercer County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Mercer County, Illinois.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2005 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedJan 2010 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G569
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Galesburg Substation (Knox County)
- Location
- Mercer County, Illinois
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 11 November 2005
- Agreement signed
- 8 January 2010
- Proposed online date
- November 2007
Location
Marker shows the centre of Mercer County; the queue data does not give exact sites.
Other requests in Mercer County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem