United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

SOLAR Β· NYISO

Taconic Solar

Taconic Solar is a 10.0 MW solar request withdrawn in the NYISO interconnection queue, in Columbia County, New York, connecting to NYSEG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2014 (completed)
  2. Withdrawn / abandonedOct 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
452
Grid region
NYISO (New York)
Utility / transmission owner
NYSEG
Developer
Taconic Solar Center, LLC
Connection point (POI)
Craryville Substation 34.5kV
Location
Columbia County, New York
Technology
Solar: 10.0 MW
Total requested
10.0 MW
Queue status
Withdrawn
Entered queue
20 August 2014
Withdrawn
October 2014

Location

Marker shows the centre of Columbia County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Columbia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem