United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
BATTERY STORAGE Β· MISOBattery storage project J2431, St. Francis County
Battery storage project J2431, St. Francis County is a 150 MW battery storage request withdrawn in the MISO interconnection queue, in St. Francis County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2431
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- West Memphis-Genpower Keo 500kV Line Break (located at "CHALKBLUFFPV" 500kV POI SS, co-located with
- Location
- St. Francis County, Arkansas
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 13 September 2022
- Proposed online date
- October 2026
- Withdrawn
- July 2025
Location
Marker shows the centre of St. Francis County; the queue data does not give exact sites.
Other requests in St. Francis County
- Solar project J1060, St. Francis CountySolar Β· 500 MW Β· under construction
- Solar + storage project S1125, St. Francis CountySolar + storage Β· 400 MW Β· in study
- Surplus; J1434Battery storage Β· 200 MW Β· in study
- Solar + storage project J3381, St. Francis CountySolar + storage Β· 151 MW Β· in study
- Solar + storage project J4038, St. Francis CountySolar + storage Β· 80.0 MW Β· in study
- Solar project J696, St. Francis CountySolar Β· 150 MW Β· withdrawn
- Solar + storage project J3071, St. Francis CountySolar + storage Β· 140 MW Β· withdrawn
- Solar project J972, St. Francis CountySolar Β· 140 MW Β· withdrawn
- Solar project J1147, St. Francis CountySolar Β· 100 MW Β· withdrawn
- Solar project J678, St. Francis CountySolar Β· 100 MW Β· withdrawn
- Solar project J1167, St. Francis CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem