United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

SOLAR + STORAGE Β· MISO

Solar + storage project J3071, St. Francis County

Solar + storage project J3071, St. Francis County is a 140 MW solar + storage request withdrawn in the MISO interconnection queue, in St. Francis County, Arkansas, connecting to ENTERGY ARKANSAS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3071
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY ARKANSAS
Connection point (POI)
Entergy Hughes - Forest City South 161 kV
Location
St. Francis County, Arkansas
Technology
Solar: 140 MW Β· Battery
Total requested
140 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
15 September 2022
Proposed online date
June 2024
Withdrawn
July 2025

Location

Marker shows the centre of St. Francis County; the queue data does not give exact sites.

Power plants in Arkansas Β· Transmission lines in Arkansas

Other requests in St. Francis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem