United States › Grid › Interconnection queues › Pennsylvania

BATTERY STORAGE · PJM

Beacon Power Flywheel Station

Beacon Power Flywheel Station is a 20.0 MW battery storage request built and operating in the PJM interconnection queue, in Luzerne County, Pennsylvania, connecting to PPL.

Queue statusOperating
  1. PlanningQueued Apr 2010 (completed)
  2. ConsentedJan 2012 (completed)
  3. Construction (completed)
  4. OperatingJul 2014 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
W1-111
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PPL
Connection point (POI)
Harwood-Berwick 69kV
Location
Luzerne County, Pennsylvania
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Operational
Entered queue
30 April 2010
Agreement signed
31 January 2012
Proposed online date
June 2014
Came online
July 2014

Location

Marker shows the centre of Luzerne County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Luzerne County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem