BATTERY STORAGE Β· SOUTHEASTBattery storage project 629, Miami-Dade County
Battery storage project 629, Miami-Dade County is a 300 MW battery storage request withdrawn in the Southeast interconnection queue, in Miami-Dade County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 629
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Krome Solar
- Location
- Miami-Dade County, Florida
- Technology
- Battery: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 8 January 2024
- Proposed online date
- December 2029
Location
Marker shows the centre of Miami-Dade County; the queue data does not give exact sites.
Other requests in Miami-Dade County
- Nuclear project 107, Miami-Dade CountyNuclear Β· 1,300 MW Β· in study
- Nuclear project 108, Miami-Dade CountyNuclear Β· 1,300 MW Β· in study
- Solar project 289, Miami-Dade CountySolar Β· 74.5 MW Β· in study
- Gas project 418, Miami-Dade CountyGas Β· 99.0 MW Β· built
- Solar project 264, Miami-Dade CountySolar Β· 74.5 MW Β· built
- Solar project 273, Miami-Dade CountySolar Β· 50.0 MW Β· built
- Nuclear project 175Nuclear Β· 30.0 MW Β· built
- Solar project 426, Miami-Dade CountySolar Β· 24.5 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem