BATTERY STORAGE · SPPBattery storage project GEN-2024-276, Shawnee County
Battery storage project GEN-2024-276, Shawnee County is a 150 MW battery storage request in interconnection study in the SPP interconnection queue, in Shawnee County, Kansas, connecting to WERE.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-276
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Connection point (POI)
- Tecumseh Hill - Swissvale 230kV Line
- Location
- Shawnee County, Kansas
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 1 March 2025
- Proposed online date
- December 2030
Location
Marker shows the centre of Shawnee County; the queue data does not give exact sites.
Other requests in Shawnee County
- Battery storage project GEN-2024-277, Shawnee CountyBattery storage · 150 MW · in study
- Solar project GEN-2017-193, Shawnee CountySolar · 202 MW · withdrawn
- Battery storage project GEN-2024-182, Shawnee CountyBattery storage · 199 MW · withdrawn
- Battery storage project GEN-2024-183, Shawnee CountyBattery storage · 199 MW · withdrawn
- Battery storage project GEN-2017-194, Shawnee CountyBattery storage · 52.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem