Battery storage project GEN-2017-194, Shawnee County

Battery storage project GEN-2017-194, Shawnee County is a 52.0 MW battery storage request withdrawn in the SPP interconnection queue, in Shawnee County, Kansas, connecting to WERE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2017 (completed)
  2. Withdrawn / abandonedMay 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-194
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WERE
Connection point (POI)
Tecumseh 230kV Substation
Location
Shawnee County, Kansas
Technology
Battery: 52.0 MW
Total requested
52.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 November 2017
Proposed online date
December 2026
Withdrawn
May 2023

Location

Marker shows the centre of Shawnee County; the queue data does not give exact sites.

Power plants in Kansas Β· Transmission lines in Kansas

Other requests in Shawnee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem