United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project J885, Worth County
Onshore wind project J885, Worth County is a 64.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Worth County, Iowa, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedJan 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J885
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- J407 Glenworth 161kV Substation
- Location
- Worth County, Iowa
- Technology
- Wind: 64.0 MW
- Total requested
- 64.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 16 June 2017
- Proposed online date
- September 2020
- Withdrawn
- January 2021
Location
Marker shows the centre of Worth County; the queue data does not give exact sites.
Other requests in Worth County
- Solar project J1174, Worth CountySolar Β· 165 MW Β· under construction
- Solar project J1520, Worth CountySolar Β· 135 MW Β· under construction
- Onshore wind project J1175, Worth CountyOnshore wind Β· 165 MW Β· agreement signed
- Onshore wind project J2342, Worth CountyOnshore wind Β· 230 MW Β· in study
- Surplus; Old GoldOther Β· 80.0 MW Β· in study
- Onshore wind project G046, Worth CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project G540, Worth CountyOnshore wind Β· 80.0 MW Β· built
- Onshore wind project G548, Worth CountyOnshore wind Β· 80.0 MW Β· built
- Onshore wind project G331, Worth CountyOnshore wind Β· 200 MW Β· withdrawn
- Battery storage project J2462, Worth CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project J2464, Worth CountySolar Β· 200 MW Β· withdrawn
- Solar project J1416, Worth CountySolar Β· 149 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem