United States › Grid › Interconnection queues › Kansas
SOLAR · SPPSolar project GEN-2023-221, Osage County
Solar project GEN-2023-221, Osage County is a 250 MW solar request in interconnection study in the SPP interconnection queue, in Osage County, Kansas, connecting to WERE.
Queue statusIn planning
- PlanningQueued Oct 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2023-221
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Connection point (POI)
- Emporia Energy Center - Swissvale 345 kV Line
- Location
- Osage County, Kansas
- Technology
- Solar: 250 MW
- Total requested
- 250 MW
- Service type
- NRIS and ERIS
- Study phase
- FACILITY STUDY STAGE
- Queue status
- Active
- Entered queue
- 2 October 2023
- Proposed online date
- December 2029
Location
Marker shows the centre of Osage County; the queue data does not give exact sites.
Other requests in Osage County
- Solar project GEN-2023-220, Osage CountySolar · 250 MW · in study
- Onshore wind project GEN-2017-125, Osage CountyOnshore wind · 252 MW · withdrawn
- Onshore wind project GEN-2020-071, Osage CountyOnshore wind · 252 MW · withdrawn
- Onshore wind project GEN-2017-127, Osage CountyOnshore wind · 252 MW · withdrawn
- Onshore wind project GEN-2017-130, Osage CountyOnshore wind · 215 MW · withdrawn
- Solar project GEN-2017-191, Osage CountySolar · 202 MW · withdrawn
- Solar project GEN-2023-219, Osage CountySolar · 125 MW · withdrawn
- Battery storage project GEN-2017-192, Osage CountyBattery storage · 52.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem