United States βΊ Grid βΊ Interconnection queues βΊ Kansas
SOLAR Β· SPPSolar project GEN-2023-219, Osage County
Solar project GEN-2023-219, Osage County is a 125 MW solar request withdrawn in the SPP interconnection queue, in Osage County, Kansas, connecting to Evergy.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-219
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- Evergy
- Connection point (POI)
- Reading - Osage Jct 115 kV Line
- Location
- Osage County, Kansas
- Technology
- Solar: 125 MW
- Total requested
- 125 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- December 2029
- Withdrawn
- August 2025
Location
Marker shows the centre of Osage County; the queue data does not give exact sites.
Other requests in Osage County
- Solar project GEN-2023-220, Osage CountySolar Β· 250 MW Β· in study
- Solar project GEN-2023-221, Osage CountySolar Β· 250 MW Β· in study
- Onshore wind project GEN-2017-125, Osage CountyOnshore wind Β· 252 MW Β· withdrawn
- Onshore wind project GEN-2020-071, Osage CountyOnshore wind Β· 252 MW Β· withdrawn
- Onshore wind project GEN-2017-127, Osage CountyOnshore wind Β· 252 MW Β· withdrawn
- Onshore wind project GEN-2017-130, Osage CountyOnshore wind Β· 215 MW Β· withdrawn
- Solar project GEN-2017-191, Osage CountySolar Β· 202 MW Β· withdrawn
- Battery storage project GEN-2017-192, Osage CountyBattery storage Β· 52.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem