United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR + STORAGE Β· PJMSolar + storage project AG2-414, Henry County
Solar + storage project AG2-414, Henry County is a 350 MW solar + storage request withdrawn in the PJM interconnection queue, in Henry County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-414
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Axton 138 kV
- Location
- Henry County, Virginia
- Technology
- Solar: 350 MW Β· Battery
- Total requested
- 350 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 March 2021
- Proposed online date
- October 2025
- Withdrawn
- December 2024
Location
Marker shows the centre of Henry County; the queue data does not give exact sites.
Other requests in Henry County
- Henry County Solar FacilitySolar Β· 50.0 MW Β· agreement signed
- Axton SolarSolar Β· 201 MW Β· suspended
- Rocky Ford Solar Energy CenterSolar Β· 90.0 MW Β· suspended
- Caden Energix AxtonSolar Β· 66.0 MW Β· built
- Smith Mountain HydroHydro Β· 34.0 MW Β· built
- Gas project AB2-145, Henry CountyGas Β· 572 MW Β· withdrawn
- Gas project AB2-146, Henry CountyGas Β· 382 MW Β· withdrawn
- Solar project AD2-216, Henry CountySolar Β· 68.0 MW Β· withdrawn
- Solar project AH1-175, Henry CountySolar Β· 20.0 MW Β· withdrawn
- LeatherwoodSolar Β· 20.0 MW Β· withdrawn
- Solar project AH1-176, Henry CountySolar Β· 18.8 MW Β· withdrawn
- Solar project AG1-468, Henry CountySolar Β· 14.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem