United States βΊ Grid βΊ Interconnection queues βΊ Indiana
COAL Β· MISOCoal project G039, Sullivan County
Coal project G039, Sullivan County is a 600 MW coal request withdrawn in the MISO interconnection queue, in Sullivan County, Indiana.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2000 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G039
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Sullivan County, Indiana
- Technology
- Coal: 600 MW
- Total requested
- 600 MW
- Queue status
- Withdrawn
- Entered queue
- 23 May 2000
- Proposed online date
- April 2003
Location
Marker shows the centre of Sullivan County; the queue data does not give exact sites.
Other requests in Sullivan County
- Solar project J829, Sullivan CountySolar Β· 250 MW Β· under construction
- Sullivan Generating Station 1Gas Β· 575 MW Β· agreement signed
- Sullivan Generating Station 2Gas Β· 575 MW Β· agreement signed
- Trade Post Solar Energy CenterSolar Β· 200 MW Β· agreement signed
- Trade Post Energy StorageBattery storage Β· 50.0 MW Β· agreement signed
- Gas project J3604, Sullivan CountyGas Β· 650 MW Β· in study
- Gas project J3084, Sullivan CountyGas Β· 642 MW Β· in study
- Solar + storage project J3075, Sullivan CountySolar + storage Β· 560 MW Β· in study
- Merom StationGas Β· 530 MW Β· in study
- Gas project J4005, Sullivan CountyGas Β· 500 MW Β· in study
- Gas project J4021, Sullivan CountyGas Β· 470 MW Β· in study
- Gas project J3331, Sullivan CountyGas Β· 470 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem