BATTERY STORAGE Β· WEST

Battery storage project PIS055, Salt Lake County

Battery storage project PIS055, Salt Lake County is a 85.0 MW battery storage request withdrawn in the West interconnection queue, in Salt Lake County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
PIS055
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Terminal substation
Location
Salt Lake County, Utah
Technology
Battery: 85.0 MW
Total requested
85.0 MW
Service type
Network resource (NRIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
25 March 2024
Proposed online date
May 2027

Location

Marker shows the centre of Salt Lake County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Salt Lake County