United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR Β· WEST

Solar project 137, Columbia County

Solar project 137, Columbia County is a 150 MW solar request withdrawn in the West interconnection queue, in Columbia County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
137
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Primary: Dodge Junction 230 kV Substation Alternate Phalen Gulch 230 kV Substation
Location
Columbia County, Washington
Technology
Solar: 150 MW
Total requested
150 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
10 November 2022
Proposed online date
April 2025

Location

Marker shows the centre of Columbia County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Columbia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem