United States βΊ Grid βΊ Interconnection queues βΊ Kansas
SOLAR Β· SPPSolar project GEN-2024-358, Lyon County
Solar project GEN-2024-358, Lyon County is a 145 MW solar request withdrawn in the SPP interconnection queue, in Lyon County, Kansas, connecting to WERE.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2024-358
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Connection point (POI)
- Marmaton - Neosho 161 kV line
- Location
- Lyon County, Kansas
- Technology
- Solar: 145 MW
- Total requested
- 145 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 1 March 2025
- Proposed online date
- December 2028
- Withdrawn
- December 2025
Location
Marker shows the centre of Lyon County; the queue data does not give exact sites.
Other requests in Lyon County
- Solar project GEN-2022-007, Lyon CountySolar Β· 135 MW Β· in study
- Gas project GEN-2006-027, Lyon CountyGas Β· 380 MW Β· built
- Gas project GEN-2006-028, Lyon CountyGas Β· 360 MW Β· built
- Onshore wind project GEN-2015-073, Lyon CountyOnshore wind Β· 200 MW Β· built
- Gas project GEN-2015-051, Lyon CountyGas Β· 916 MW Β· withdrawn
- Gas project GEN-2015-050, Lyon CountyGas Β· 464 MW Β· withdrawn
- Onshore wind project GEN-2009-005, Lyon CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem