United States βΊ Grid βΊ Interconnection queues βΊ Illinois
SOLAR + STORAGE Β· PJMSolar + storage project AG2-575, Dekalb County
Solar + storage project AG2-575, Dekalb County is a 100 MW solar + storage request withdrawn in the PJM interconnection queue, in Dekalb County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-575
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Developer
- Red Maple Solar, LLC
- Connection point (POI)
- Crego Rd. 138 kV
- Location
- Dekalb County, Illinois
- Technology
- Solar: 100 MW Β· Battery
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 11 March 2025
- Proposed online date
- December 2024
- Withdrawn
- December 2025
Location
Marker shows the centre of Dekalb County; the queue data does not give exact sites.
Other requests in Dekalb County
- Burr Oak SolarSolar Β· 300 MW Β· in study
- Solar project AH2-085, Dekalb CountySolar Β· 145 MW Β· in study
- Solar + storage project AI1-170, Dekalb CountySolar + storage Β· 100 MW Β· in study
- Red Maple SolarSolar Β· 95.1 MW Β· in study
- Solar project AI2-409, Dekalb CountySolar Β· 72.0 MW Β· in study
- Solar project AI1-147, Dekalb CountySolar Β· 64.0 MW Β· in study
- Solar project AI2-417, Dekalb CountySolar Β· 48.0 MW Β· in study
- Solar project AI2-410, Dekalb CountySolar Β· 28.5 MW Β· in study
- Solar project AI2-403, Dekalb CountySolar Β· 19.5 MW Β· in study
- Solar project AG1-119, Dekalb CountySolar Β· 300 MW Β· withdrawn
- Solar project AG1-423, Dekalb CountySolar Β· 200 MW Β· withdrawn
- Onshore wind project AD2-148, Dekalb CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem