United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR Β· WEST

Solar project 1069, Yakima County

Solar project 1069, Yakima County is a 5.0 MW solar request withdrawn in the West interconnection queue, in Yakima County, Washington, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1069
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
White Swan substation OR Circuit 5Y690 out of White Swan substation
Location
Yakima County, Washington
Technology
Solar: 5.0 MW
Total requested
5.0 MW
Service type
Network resource (NRIS)
Study phase
Request moved to transition cluster
Queue status
Withdrawn
Entered queue
17 September 2018
Proposed online date
December 2019

Location

Marker shows the centre of Yakima County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Yakima County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem