United States βΊ Grid βΊ Interconnection queues βΊ Arizona
BATTERY STORAGE Β· WESTBattery storage project Q263, Pinal County
Battery storage project Q263, Pinal County is a 20.0 MW battery storage request withdrawn in the West interconnection queue, in Pinal County, Arizona, connecting to Arizona Public Service.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Q263
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Arizona Public Service
- Connection point (POI)
- 69kV Line N Buris Rd - Casa Grande
- Location
- Pinal County, Arizona
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 29 September 2017
- Proposed online date
- December 2020
Location
Marker shows the centre of Pinal County; the queue data does not give exact sites.
Other requests in Pinal County
- Solar + storage project Q295, Pinal CountySolar + storage Β· 250 MW Β· agreement signed
- Solar + storage project Q264, Pinal CountySolar + storage Β· 130 MW Β· agreement signed
- Solar project Q254, Pinal CountySolar Β· 100 MW Β· agreement signed
- Gas project Q32, Pinal CountyGas Β· 928 MW Β· in study
- Solar + storage project Q563, Pinal CountySolar + storage Β· 500 MW Β· in study
- Solar + storage project 2021-G4, Pinal CountySolar + storage Β· 463 MW Β· in study
- Battery storage project Q2413, Pinal CountyBattery storage Β· 409 MW Β· in study
- Solar + storage project Q537, Pinal CountySolar + storage Β· 400 MW Β· in study
- Other project Q589, Pinal CountyOther Β· 400 MW Β· in study
- Solar + storage project Q09, Pinal CountySolar + storage Β· 400 MW Β· in study
- Battery storage project Q2516, Pinal CountyBattery storage Β· 352 MW Β· in study
- Battery storage project Q584, Pinal CountyBattery storage Β· 350 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem