United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
ONSHORE WIND Β· SPPOnshore wind project GEN-2014-004IS, Billings County
Onshore wind project GEN-2014-004IS, Billings County is a 383 MW onshore wind request withdrawn in the SPP interconnection queue, in Billings County, North Dakota, connecting to BEPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2015 (completed)
- Withdrawn / abandonedAug 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2018 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2014-004IS
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- Charlie Creek 230kV
- Location
- Billings County, North Dakota
- Technology
- Wind: 383 MW
- Total requested
- 383 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 24 November 2015
- Proposed online date
- December 2018
- Came online
- December 2018
- Withdrawn
- August 2018
Location
Marker shows the centre of Billings County; the queue data does not give exact sites.