BATTERY STORAGE Β· WESTBattery storage project CS24-04, Spokane County
Battery storage project CS24-04, Spokane County is a 100 MW battery storage request withdrawn in the West interconnection queue, in Spokane County, Washington, connecting to Avista Utilities.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedAug 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- CS24-04
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Avista Utilities
- Connection point (POI)
- Benewah 230kV Station
- Location
- Spokane County, Washington
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- Request Status: Withdrawn; Phase One Cluster Study: Complete
- Queue status
- Withdrawn
- Entered queue
- 1 April 2024
- Proposed online date
- December 2028
- Withdrawn
- August 2024
Location
Marker shows the centre of Spokane County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Spokane County
- Solar project CS24-14, Spokane CountySolar Β· 40.0 MW Β· agreement signed
- Solar project CS23-14, Spokane CountySolar Β· 40.0 MW Β· agreement signed
- Battery storage project CS24-02, Spokane CountyBattery storage Β· 0.5 MW Β· agreement signed
- Battery storage project CS25-08, Spokane CountyBattery storage Β· 250 MW Β· in study
- Onshore wind project CS25-15, Spokane CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project CS25-17, Spokane CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project 104, Spokane CountyOnshore wind Β· 120 MW Β· in study
- Battery storage project CS25-03, Spokane CountyBattery storage Β· 100 MW Β· in study
- Solar + storage project 80, Spokane CountySolar + storage Β· 19.0 MW Β· in study
- Battery storage project 70, Spokane CountyBattery storage Β· 2.5 MW Β· in study
- Solar + storage project 120, Spokane CountySolar + storage Β· 1.0 MW Β· in study
- Hydro project 39, Spokane CountyHydro Β· 7.6 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem