United States › Grid › Interconnection queues › Arizona

GAS · WEST

Gas project Q98, Pinal County

Gas project Q98, Pinal County is a 96.4 MW gas request built and operating in the West interconnection queue, in Pinal County, Arizona, connecting to Salt River Project.

Queue statusOperating
  1. PlanningQueued Sep 2022 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingTarget Jun 2024 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Q98
Grid region
West (non-ISO utilities)
Utility / transmission owner
Salt River Project
Connection point (POI)
Abel 69 kV
Location
Pinal County, Arizona
Technology
Gas: 96.4 MW
Total requested
96.4 MW
Study phase
IA Executed
Queue status
Operational
Entered queue
21 September 2022
Proposed online date
June 2024

Location

Marker shows the centre of Pinal County; the queue data does not give exact sites.

Power plants in Arizona · Transmission lines in Arizona

Other requests in Pinal County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem