United States βΊ Grid βΊ Interconnection queues βΊ New Mexico
SOLAR Β· WESTAL200S Project
AL200S Project is a 200 MW solar request withdrawn in the West interconnection queue, in Luna County, New Mexico, connecting to El Paso Electric Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LG-21-9-2
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- El Paso Electric Company
- Connection point (POI)
- Luna-Afton 345kV
- Location
- Luna County, New Mexico
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 24 September 2021
- Proposed online date
- October 2024
Location
Marker shows the centre of Luna County; the queue data does not give exact sites.
Power plants in New Mexico Β· Transmission lines in New Mexico
Other requests in Luna County
- AN100SSolar Β· 100 MW Β· agreement signed
- AN50BBattery storage Β· 50.0 MW Β· agreement signed
- Solar project SGI-PNM-2017-08, Luna CountySolar Β· 11.0 MW Β· agreement signed
- Solar project SGI-PNM-2017-09, Luna CountySolar Β· 8.3 MW Β· agreement signed
- LD200SBSolar + storage Β· 200 MW Β· in study
- Me199SBSolar + storage Β· 199 MW Β· in study
- Me195SBSolar + storage Β· 195 MW Β· in study
- LA130S ProjectSolar + storage Β· 130 MW Β· in study
- LA300WOnshore wind Β· 300 MW Β· suspended
- Macho Springs Solar PVSolar Β· 50.0 MW Β· built
- Solar project TI-15-0227, Luna CountySolar Β· 25.0 MW Β· built
- Solar project SGI-PNM-2010-13, Luna CountySolar Β· 9.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem