United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
BATTERY STORAGE Β· PJMBattery storage project W4-085, Philadelphia County
Battery storage project W4-085, Philadelphia County is a 2.0 MW battery storage request withdrawn in the PJM interconnection queue, in Philadelphia County, Pennsylvania, connecting to PECO.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2011 (completed)
- Withdrawn / abandonedJun 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W4-085
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PECO
- Connection point (POI)
- Grays Ferry
- Location
- Philadelphia County, Pennsylvania
- Technology
- Battery: 2.0 MW
- Total requested
- 2.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 January 2011
- Proposed online date
- May 2011
- Withdrawn
- June 2014
Location
Marker shows the centre of Philadelphia County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Philadelphia County
- Phillips IslandGas Β· 725 MW Β· built
- Phillips IslandGas Β· 25.0 MW Β· built
- Grays Ferry Cogeneration PartnershipGas Β· 13.0 MW Β· built
- Other project W2-014, Philadelphia CountyOther Β· 2.0 MW Β· built
- Gas project U1-012, Philadelphia CountyGas Β· 630 MW Β· withdrawn
- Gas project A27, Philadelphia CountyGas Β· 615 MW Β· withdrawn
- Gas project G45, Philadelphia CountyGas Β· 575 MW Β· withdrawn
- Gas project H08, Philadelphia CountyGas Β· 560 MW Β· withdrawn
- Gas project D28, Philadelphia CountyGas Β· 550 MW Β· withdrawn
- Gas project AA2-077, Philadelphia CountyGas Β· 220 MW Β· withdrawn
- Gas project AA2-050, Philadelphia CountyGas Β· 210 MW Β· withdrawn
- Gas project O64, Philadelphia CountyGas Β· 201 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem