πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

GAS Β· PJM

Gas project U1-012, Philadelphia County

Gas project U1-012, Philadelphia County is a 630 MW gas request withdrawn in the PJM interconnection queue, in Philadelphia County, Pennsylvania, connecting to PECO.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2008 (completed)
  2. Withdrawn / abandonedSep 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
U1-012
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PECO
Connection point (POI)
Richmond
Location
Philadelphia County, Pennsylvania
Technology
Gas: 630 MW
Total requested
630 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
7 February 2008
Proposed online date
January 2013
Withdrawn
September 2009

Location

Marker shows the centre of Philadelphia County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Philadelphia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem