United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

ONSHORE WIND Β· MISO

Onshore wind project G634, Brookings County

Onshore wind project G634, Brookings County is a 96.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Brookings County, South Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2006 (completed)
  2. Withdrawn / abandonedDec 2012 (project stopped here)
  3. ConsentedDec 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G634
Grid region
MISO (Midcontinent)
Connection point (POI)
Brookings Substation 115 kV
Location
Brookings County, South Dakota
Technology
Wind: 96.0 MW
Total requested
96.0 MW
Study phase
Network Upgrade
Queue status
Withdrawn
Entered queue
27 April 2006
Agreement signed
27 December 2012
Proposed online date
July 2007
Withdrawn
December 2012

Location

Marker shows the centre of Brookings County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Brookings County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem