United States › Grid › Interconnection queues › Iowa
ONSHORE WIND · MISOOnshore wind project J836, Kossuth County
Onshore wind project J836, Kossuth County is a 200 MW onshore wind request built and operating in the MISO interconnection queue, in Kossuth County, Iowa, connecting to ITC MIDWEST.
Request details
- Queue ID
- J836
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Ledyard 345kV Substation
- Location
- Kossuth County, Iowa
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: GIA; Post GIA Status: In Service
- Queue status
- Operational
- Entered queue
- 16 June 2017
- Agreement signed
- 19 May 2021
- Proposed online date
- September 2022
- Came online
- September 2022
Location
Marker shows the centre of Kossuth County; the queue data does not give exact sites.
Other requests in Kossuth County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem