United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

ONSHORE WIND Β· MISO

Onshore wind project H077, Kossuth County

Onshore wind project H077, Kossuth County is a 250 MW onshore wind request withdrawn in the MISO interconnection queue, in Kossuth County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2008 (completed)
  2. Withdrawn / abandonedMay 2011 (project stopped here)
  3. ConsentedMay 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
H077
Grid region
MISO (Midcontinent)
Connection point (POI)
Winnebago - Winco 161 kV
Location
Kossuth County, Iowa
Technology
Wind: 250 MW
Total requested
250 MW
Study phase
Optional
Queue status
Withdrawn
Entered queue
20 June 2008
Agreement signed
4 May 2011
Proposed online date
December 2011
Withdrawn
May 2011

Location

Marker shows the centre of Kossuth County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Kossuth County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem