United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· WESTOnshore wind project GI-0813a, Kossuth County
Onshore wind project GI-0813a, Kossuth County is a 145 MW onshore wind request withdrawn in the West interconnection queue, in Kossuth County, Iowa, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2008 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0813a
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Burt 161kV
- Location
- Kossuth County, Iowa
- Technology
- Wind: 145 MW
- Total requested
- 145 MW
- Service type
- NRIS and ERIS
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 17 June 2008
- Proposed online date
- December 2010
Location
Marker shows the centre of Kossuth County; the queue data does not give exact sites.
Other requests in Kossuth County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem