United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

SOLAR Β· SOUTHEAST

Solar project 24

Solar project 24 is a 74.5 MW solar request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2018 (completed)
  2. Withdrawn / abandonedJan 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Seminole Electric Cooperative
Connection point (POI)
Seminole Generating Station/ Rice 230
Location
Florida
Technology
Solar: 74.5 MW
Total requested
74.5 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: System Impact; Status: SIS Complete 12/23/2019 Withdrawn by Customer on 01/21/2020
Queue status
Withdrawn
Entered queue
17 October 2018
Proposed online date
December 2020
Withdrawn
January 2020

Location

No county location in the queue data.

Power plants in Florida Β· Transmission lines in Florida

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem