Onshore wind project N48, Ogle County

Onshore wind project N48, Ogle County is a 84.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Ogle County, Illinois, connecting to ComEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2005 (completed)
  2. Withdrawn / abandonedMar 2005 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
N48
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Lancaster-Maryland 138kV
Location
Ogle County, Illinois
Technology
Wind: 84.0 MW
Total requested
84.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
31 January 2005
Proposed online date
December 2005
Withdrawn
March 2005

Location

Marker shows the centre of Ogle County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Ogle County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem